Published 1991
| Version v1
Journal article
Schedule and cost reduction of nuclear generating facilities in Ontario study overview
Description
During the five year period 1985 to 1990, Ontario Hydro conducted a major study with the objective to reduce the cost and construction duration for future nuclear generating facilities in Ontario. This paper reports on the study called Major Projects: Schedule and Cost Reduction Study (SCRS). Ontario Hydro is a public utility with the responsibility for meeting electricity need for the province of Ontario with a population of 9.6 million. In order to adequately address future electricity needs, Ontario Hydro has developed and submitted a demand/supply plan which covers the next 25 years. The SCRS for major projects contributed to this demand/supply plan
Additional details
Publishing Information
- Journal Title
- Proceedings of the American Power Conference
- Journal Volume
- 53
- Series
- Proc. Am. Power Conf.
- Journal Page Range
- 1061-1072
- ISSN
- 0097-2126
- CODEN
- PAPWA
Conference
- Title
- 53. annual American power conference.
- Dates
- 29 Apr - 1 May 1991.
- Place
- Chicago, IL (United States).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 23023305
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; S29: ENERGY PLANNING, POLICY AND ECONOMY;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- CONSTRUCTION; ECONOMIC ANALYSIS; ENERGY DEMAND; NUCLEAR POWER PLANTS; ONTARIO; PLANNING; SCHEDULES; SUPPLY AND DEMAND
- Descriptors DEC
- CANADA; DEMAND; DEVELOPED COUNTRIES; NORTH AMERICA; NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS
Optional Information
- Secondary number(s)
- CONF-9104106--.