Published October 1981 | Version v1
Report Restricted

Design report for core assemblies of KNK II/2: Mark II assemblies of the test zone (Central position)2.4 and 2.5

Description

The report describes the Mark II assemblies for the central position of the second core of KNK II and their behavior during the operation period of 455 equivalent full-power days. The tasks and the design of the assemblies and their individual components are described, and the criteria, methods and results of their design are presented. With the help of generally valid standards for strength criteria the capacitance of the assemblies and their components is evidenced, and the fulfilment of the design criteria is shown

Availability note (English)

Available from INIS in electronic form

Abstract (German)

Der Bericht beschreibt die Mark II Zentral-Elemente der Zweitbeladung der KNK II und ihr Verhalten waehrend der Betriebsperiode von 455 Vollasttagen. Es werden die Aufgaben und der Aufbau der Elemente und ihrer Einzelkomponenten beschrieben, und es werden Methoden, Kriterien und Ergebnisse ihrer Auslegung dargelegt. Anhand allgemein gueltiger Standards fuer Festigkeitskriterien wird die Belastbarkeit der Elemente und Einzelkomponenten nachgewiesen, und es wird die Erfuellung der Auslegungskriterien gezeigt

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Additional titles

Original title (German)
Auslegungsbericht fuer Kernelemente KNK II/2: Mark II Elemente der Testzone (Zentralelemente) 2.4 und 2.5

Publishing Information

Imprint Pagination
145 p.
Report number
IA--33.02749.5

Optional Information

Notes
refs, figs, tabs
Secondary number(s)
INIS-DE-IA--042