Published August 2004
| Version v1
Journal article
The remediation of abandoned workings of a mining area in Ningxiang uranium mine
Creators
- 1. Nanhua Univ., Hengyang (China). School of Architecture, Resources and Environment Engineering
- 2. Ningxiang Uranium Mine, CNNC, Ningxiang (China)
- 3. Changchun Gold Research Inst., Changchun (China)
Description
The typical mining under buildings and river was used in a mining area of Ningxiang uranium mine. After the mining ended, 32.1% of the 2.68 m3 abandoned workings did not fill because of limitation of the cut-and-fill mining method at that time. To remedy this, the mine used new filling methods. After the remedial action, the filling coefficient of pits reached 100%, and that of tunnels reached 86%. It can be proved by the monitoring data that the subsiding of surface has been effectively controlled at the abandoned workings
Additional details
Publishing Information
- Journal Title
- Uranium Mining and Metallurgy
- Journal Volume
- 23
- Journal Issue
- 3
- Journal Page Range
- p. 151-154
- ISSN
- 1000-8063
INIS
- Country of Publication
- China
- Country of Input or Organization
- China
- INIS RN
- 36029066
- Subject category
- S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; S58: GEOSCIENCES;
- Descriptors DEI
- BACKFILLING; CHINA; DECOMMISSIONING; MINING; REMEDIAL ACTION; URANIUM MINES
- Descriptors DEC
- ASIA; MINES; UNDERGROUND FACILITIES