Published August 2004 | Version v1
Journal article

The remediation of abandoned workings of a mining area in Ningxiang uranium mine

  • 1. Nanhua Univ., Hengyang (China). School of Architecture, Resources and Environment Engineering
  • 2. Ningxiang Uranium Mine, CNNC, Ningxiang (China)
  • 3. Changchun Gold Research Inst., Changchun (China)

Description

The typical mining under buildings and river was used in a mining area of Ningxiang uranium mine. After the mining ended, 32.1% of the 2.68 m3 abandoned workings did not fill because of limitation of the cut-and-fill mining method at that time. To remedy this, the mine used new filling methods. After the remedial action, the filling coefficient of pits reached 100%, and that of tunnels reached 86%. It can be proved by the monitoring data that the subsiding of surface has been effectively controlled at the abandoned workings

Additional details

Publishing Information

Journal Title
Uranium Mining and Metallurgy
Journal Volume
23
Journal Issue
3
Journal Page Range
p. 151-154
ISSN
1000-8063

INIS

Country of Publication
China
Country of Input or Organization
China
INIS RN
36029066
Subject category
S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; S58: GEOSCIENCES;
Descriptors DEI
BACKFILLING; CHINA; DECOMMISSIONING; MINING; REMEDIAL ACTION; URANIUM MINES
Descriptors DEC
ASIA; MINES; UNDERGROUND FACILITIES