Published March 2021
| Version v1
Journal article
Quo vadis, grid stability? Challenges increase as generation portfolio changes
Creators
- 1. PreussenElektra GmbH, Hannover (Germany). Systems Engineering and Safety Analyses
Description
The power generation portfolio in the German high voltage transmission and distribution system has been constantly changing since 2011. After several decades with relatively constant segmentation into base-, medium- and peak-load and a power plant park designed accordingly for these purposes, significant changes have occurred in the last 10 years. As an important result of the so-called Energiewende, starting in 2011 with the shutdown of the first German nuclear power plants (NPP) after the reactor accident in Fukushima, the last NPPs will go eventually offline by the end of 2022.
Additional details
Publishing Information
- Journal Title
- Atw. Internationale Zeitschrift fuer Kernenergie
- Journal Volume
- 66
- Journal Issue
- 2
- Journal Page Range
- p. 16-26
- ISSN
- 1431-5254
INIS
- Country of Publication
- Germany
- Country of Input or Organization
- Germany
- INIS RN
- 52059864
- Subject category
- S24: POWER TRANSMISSION AND DISTRIBUTION;
- Descriptors DEI
- FUKUSHIMA DAIICHI NUCLEAR POWER STATION; NUCLEAR POWER PLANTS; PEAK LOAD; POWER GENERATION; POWER SYSTEMS; REACTOR ACCIDENTS; REACTOR SHUTDOWN
- Descriptors DEC
- ACCIDENTS; ENERGY SYSTEMS; NUCLEAR FACILITIES; POWER PLANTS; REACTOR LIFE CYCLE; REACTOR SITES; SHUTDOWN; THERMAL POWER PLANTS