Published July 1990 | Version v1
Report

Inspection accessibility study of the Millstone Unit 1 Reactor Pressure Vessel

  • 1. Westinghouse Electric Corp., Pittsburgh, PA (USA)

Description

The need for more extensive ultrasonic examination of the Reactor Pressure Vessel (RPV) shell welds at some of the BWR plants is becoming apparent. Recent NRC comments regarding limits on future inspection relief requests and proposed revisions to the ASME Boiler and Pressure Vessel Code, Section 11 have caused BWR plant owners and vendors of inspection services to look at inspection tooling that would allow for the ultrasonic examination of RPV shell welds previously considered inaccessible. One approach to inspection of the RPV shell welds that will allow for greater coverage at some BWR plants is to perform these inspections from inside the vessel. Such inside the vessel examinations are routinely performed in the BWRs in Sweden and Finland. In late 1988, Westinghouse received a contract from Northeast Utilities to examine the flange ligament areas and the shell welds in the upper portion of the Millstone Unit 1 RPV during an outage scheduled to begin in April 1989. This examination was performed with an inspection tool placed inside of the vessel and the UDRPS data acquisition system. The inspection tool was based on tooling used routinely at the Swedish and Finnish BWRs. The object of RP C105-1 was to use the information gathered prior to and during and prepare a report covering the lessons learned during the examination that would benefit other BWR utilities considering similar inspections. This document, Volume 2, describes the Millstone Unit 1 inspection and the lessons learned as a result. 9 figs

Availability note (English)

Research Reports Center, Box 50490, Palo Alto, CA 94303.

Additional details

Additional titles

Subtitle (English)
Volume 2, Vessel inspection and lessons learned: Final report

Publishing Information

Imprint Pagination
39 p.
Report number
EPRI-NP--6899-D-Vol.2