Published July 1988 | Version v1
Report Restricted

Interpretation of hydraulic tests conducted in the waste-handling shaft at the Waste Isolation Pilot Plant (WIPP) site

Description

A series of sub-horizontal boreholes from 8- to 41-feet deep were drilled from four depth levels in the waste-handling shaft at the Waste Isolation Pilot Plant (WIPP) site in southeastern New Mexico. The boreholes were drilled at the 782- and 805-foot depth levels in a mudstone and a claystone of the unnamed lower member of the upper Rustler Formation; at the 850-foot depth level in bedded halite in the upper Salado Formation; and at the 1350-foot depth level in halite, anhydrite, and polyhalite of the Salado Formation. Examination of the cores recovered from one borehole at each level indicated no direct evidence of construction-induced fracturing. Pulse-injection test were conducted in packer-isolated intervals in six of the boreholes to estimate the formations's hydraulic conductivity and apparent formation pressure, and to determine whether or not there was evidence of construction-enhanced permeability up to one shaft diameter from the shaft wall. 12 ref., 67 figs., 19 tabs

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A09/MF A01; 1 as DE88014193.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
195 p.
Report number
SAND--88-7001

Optional Information

Notes
Portions of this document are illegible in microfiche products.