Published March 1992 | Version v1
Report Restricted

Helium bubble distributions in reactor tank repair specimens

Description

This report discusses the Reactor Tank Repair (RTR) program was initiated to develop an in-tank repair process capable of repairing stress corrosion cracks within the SRS reactor tank walls, in the event that such a repair is needed. Previous attempts to repair C-reactor tank with a gas tungsten arc (GTA) welding process were unsuccessful due to significant cracking that occurred in the heat-affected-zones adjacent to the repair welds. It was determined that this additional cracking was a result of helium embrittlement caused by the combined effects of helium (existing within the tank walls), the high heat input associated with the GTA process, and weld shrinkage stresses. Based on the results of earlier studies it was suggested that the effects of helium embrittlement could be minimized by using a low heat input GMA process. Metallographic analysis played an important role throughout the investigation of alternative welding methods for the repair of helium-containing materials

Availability note (English)

MF available from INIS under the Report Number; OSTI as DE93003374; NTIS; INIS; US Govt. Printing Office Dep.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Additional titles

Subtitle (English)
Part 1

Publishing Information

Imprint Pagination
43 p.
Report number
WSRC-TR--91-141

Optional Information

Contract/Grant/Project number
Contract AC09-89SR18035
Funding organization
USDOE, Washington, DC (United States).