Published January 1995 | Version v1
Journal article

Monitoring systems and determination of actual fatigue usage

  • 1. Gemeinschaftskernkraftwerk Neckar GmbH, Neckarwestheim (Germany)
  • 2. TUeV-Suedwest e.V, Filderstadt (Germany)
  • 3. MPA Stuttgart, Stuttgart (Germany)
  • 4. AMTEC GmbH, Leinfelden (Germany)

Description

At GKN, fatigue monitoring of important components has been conducted since 1979. The monitoring methods depend on the mechanisms of damage; quasi-static loads are regarded as well as dynamic loads. The components were selected for monitoring on the basis of a system analysis. The data resulting from monitoring are used to optimise operation mode steadily. Experience shows that the use of monitoring data as input for fatigue assessment is the most realistic and cost-effective way. This fatigue assessment uses global and local sensitivity studies to evaluate the load-stress relation for each component. These relations can be programmed to produce stress vs. time curves. These are processed according to ASME rules to give a realistic fatigue usage. ((orig.))

Additional details

Publishing Information

Journal Title
Nuclear Engineering and Design
Journal Volume
153
Journal Issue
2-3
Journal Page Range
p. 127-133.
ISSN
0029-5493
CODEN
NEDEAU