Impact of some key plasma reactor performance parameters on the required price of single- and tandem-junction α-Si modules
Creators
- 1. Research Triangle Institute, Research Triangle Park, NC 27709
Description
A previous analysis of PV module manufacturing cost showed that single- and tandem-junction α-Si modules may potentially be manufactured and sold in the $0.90/Wp to /1.60/Wp range if certain key processing parameters primarily associated with the plasma reactor are achieved. This paper compares in more detail tradeoffs in those parameters for both α-Si:H and α-Si:H/α-SiGe:H modules in the context of a 25 MW/yr manufacturing operation, as computed using a previously developed costing model called Interactive Manufacturing Cost Analysis Program (IMCAP). For these technology scenarios, achievement of sub-$1/Wp not only requires module efficiencies of at least 12-15%, but also plasma reactor yields >90%, i-layer depositions approaching 25A/s, and gas utilizations approaching 50%
Additional details
Publishing Information
- Publisher
- IEEE Service Center.
- Imprint Place
- Piscataway, NJ (USA)
- Imprint Title
- Nineteenth IEEE photovoltaic specialists conference, 1987. (Conference Record)
- Journal Page Range
- p. 1261-1265.
Conference
- Title
- 19. IEEE photovoltaic specialists conference.
- Dates
- 4-8 May 1987.
- Place
- New Orleans, LA (USA).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 19048141
- Subject category
- S70: PLASMA PHYSICS AND FUSION TECHNOLOGY; S36: MATERIALS SCIENCE;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- COMPUTER CALCULATIONS; COST; EFFICIENCY; FABRICATION; FEASIBILITY STUDIES; GERMANIUM ALLOYS; PERFORMANCE; PLASMA RINGS; SILICON ALLOYS; TANDEM MIRRORS; TRADE
- Descriptors DEC
- ALLOYS; MAGNETIC MIRRORS; OPEN PLASMA DEVICES; THERMONUCLEAR DEVICES