Published August 1992 | Version v1
Report Open

Measurements of beam pipe eddy current effects in Main Injector dipole magnets

Description

The dipole magnets for the proposed Main Injector project at Fermilab are designed to ramp to maximum field (1.7 T) at rates over 2.5 T/s. These ramp rates will produce eddy current effects which degrade overall field quality. A harmonics probe was constructed for the purpose of measuring eddy current field components during the ramp cycle. Three separate ramp rates were employed ranging from 1.3 T/s to 2.7 T/s. Tests were performed using beam pipes with two different resistivities. The dominant multipole contribution resulting from eddy current effects in each beam pipe was sextupole. The sextupole component closely matched the calculated prediction

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE94005997; NTIS; US Govt. Printing Office Dep.

Files

25040264.pdf

Files (270.3 kB)

Name Size Download all
md5:c6b8d9feda9feec8cbf384f573506184
270.3 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
5 p.
Report number
FNAL/C--92/220

Conference

Title
International conference on high energy accelerators.
Dates
20-24 Jul 1992.
Place
Hamburg (Germany).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
25040264
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
EDDY CURRENTS; HARMONICS; ION BEAM INJECTION; MAGNETS; PIPES
Descriptors DEC
BEAM INJECTION; CURRENTS; ELECTRIC CURRENTS; EQUIPMENT; OSCILLATIONS

Optional Information

Contract/Grant/Project number
Contract AC02-76CH03000
Funding organization
USDOE, Washington, DC (United States).
Secondary number(s)
CONF-920706--56.