Belle II Detector: status and proposed US contributions
Description
Conference proceedings for the 2012 American Physical Society, Division of Particles and Fields (DPF2012) conference. Paper is on the US contibutions to the Belle II detector upgrade. High precision flavor physics measurements are an essential complement to the direct searches for new physics at the LHC. Such measurements will be performed using the upgraded Belle II detector and upgraded KEKB accelerator. The status of the Belle II detector and proposed role of the US Belle II collaborators are presented in this article. The B factory experiments, Belle at the KEKB collider at KEK and BaBar at the PEP II collider at SLAC, were built to measure the large mixing-induced CP violation in the B0 system predicted by the theory of Kobayashi and Maskawa. The successful confirmation of the prediction led to the Nobel Prize for both theorists. The B factories were built to answer the question Is the CKM description in the Standard Model correct? Most B factory results are in good agreement with the expectations from the Standard Model (SM) and confirm the CKM structure of quark mixing and CP violation, but some measurements show tensions with the SM prediction. The Super B factories will address the question In what way is the Standard Model wrong? Much larger datasets are needed for high-precision measurements to search for significant deviations from the SM which are expected to exist. The SuperKEKB and Belle II detector are being constructed to perform these high precision studies with a dataset 50ab-1. The SuperKEKB accelerator will operate at an instantaneous luminosity of 8 x 1035cm-2s-1, a factor of 40 times higher than the luminosity of the KEKB accelerator at the end of the Belle physics program. The increased luminosity will derive primarily from shrinking the beam size at the interaction point (nano beams) utilizing new final focus quadrapole magnets in combination with a factor of 2 increase in beam currents. To counteract the increase in the beam-beam parameter due to the reduced beta functions, the beam emittance must also be reduced; this will be achieved with a new electron source and a new damping ring.
Availability note (English)
Available from American Physical Society, College Park, MD (US)Additional details
Publishing Information
- Imprint Pagination
- 3 p.
- Report number
- PNNL-SA--83179
Conference
- Title
- Division of Particles and Fields of the American Physical Society Meeting
- Acronym
- DPF 2011
- Dates
- 9-13 Aug 2011
- Place
- Providence, RI (United States)
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 43001473
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- ACCELERATORS; ACCURACY; BEAM CURRENTS; BEAM EMITTANCE; DAMPING; ELECTRON SOURCES; FORECASTING; LUMINOSITY; MAGNETS; PHYSICS; QUARKS; STANDARD MODEL; STANFORD LINEAR ACCELERATOR CENTER
- Descriptors DEC
- CURRENTS; EQUIPMENT; FERMIONS; FIELD THEORIES; GRAND UNIFIED THEORY; MATHEMATICAL MODELS; NATIONAL ORGANIZATIONS; OPTICAL PROPERTIES; PARTICLE MODELS; PARTICLE SOURCES; PHYSICAL PROPERTIES; QUANTUM FIELD THEORY; RADIATION SOURCES; UNIFIED GAUGE MODELS; US DOE; US ERDA; US ORGANIZATIONS
Optional Information
- Contract/Grant/Project number
- KA1201020; AC05-76RL01830
- Funding organization
- US Department of Energy (United States)