Automatic translation: Introduction: In phase IB of the HHT project, three system concepts with the The aim was to select a preference concept by October 1976 and to focus on further deepening it until it was compared with an HTR two-circuit system in mid-1977. The three concepts were: 1. One-loop system with intermediate cooling in an integrated design (INT), 1200 MW 2. Combined helium turbine steam power plant with integrated Helim turbine Circuit (KD), 1200 MW 3. One-loop system with intermediate cooling in a non-integrated design (NINT), 1000 MW

Abstract (German)

Einleitung: In der Phase IB des HHT-Projekts wurden seit Herbst 1975 von der Planungsgruppe unter Federführung von HRB/BBC-Mannheim drei Anlagenkonzepte mit dem Ziel bearbeitet, bis Oktober 1976 ein Präferenzkonzept auszuwählen und dieses bis zum Vergleich mit einer HTR-Zweikreisanlage Mitte 1977 schwerpunktmäßig weiter zu vertiefen. Die drei Konzepte waren: 1. Ein-Loop-Anlage mit Zwischenkühlung in integrierter Bauweise (INT), 1200 MW 2. Kombinierte Heliumturbinen-Dampfkraftanlage mit integriertem Helim-Turbinen- Kreislauf (KD), 1200 MW 3. Ein-Loop-Anlage mit Zwischenkühlung in nichtintegrierter Bauweise (NINT), 1000 MW

Files

52056992.pdf

Files (3.0 MB)

Name Size Download all
md5:6c8dbdbeffd1cef3392067ef94f14822
3.0 MB Preview Download

System files (65.4 kB)

Name Size Download all

Additional details

Additional titles

Original title (German)
HHT Hochtemperaturreaktor mit Heliumturbine Grosser Leistung: HHT-NINT-Anlagenkonzept 1000 MW Abschlussbericht. Band 1

Publishing Information

Imprint Pagination
60 p.
Report number
KFA-HHT--25-1

Optional Information

Notes
Document from Juelich Preservation Project; Figs.