Snubber reduction program at the Byron Station, Unit 1

Description

Commonwealth Edison Company's (CECo's) Byron Station, unit 1, was originally designed with approximately 1200 snubbers supporting the plant's large- and small-bore piping systems. This relatively large number of snubbers is attributed to excessive conservatism in nuclear piping codes and regulations effective during the original piping design. A recent pilot program at CECo's LaSalle County Station, a boiling water reactor plant, demonstrated that a 50% or greater reduction in total snubber population is achievable in plants of this design vintage. Based on the successful results of the pilot program, CECo initiated a full scale snubber reduction program at Byron, a pressurized water reactor plant of the same vintage at the LaSalle County Station. The benefits from a reduced snubber population are described. To realize the maximum potential benefits, all snubbers in the plant were prioritized in order of desirability for removal. The priority designations are discussed. The major results from phase 1 of the Byron program are summarized. The NRC inspection of the project addressed a variety of issues and is discussed. The conclusions that can be drawn from the phase 1 program are summarized

Additional details

Publishing Information

Journal Title
Transactions of the American Nuclear Society
Journal Volume
55
Series
Trans. Am. Nucl. Soc.
Journal Page Range
524-525
ISSN
0003-018X
CODEN
TANSA

Conference

Title
American Nuclear Society winter meeting.
Dates
15-19 Nov 1987.
Place
Los Angeles, CA (USA).

Optional Information

Secondary number(s)
CONF-8711195--.