Trim coil power supplies
Creators
Description
The 18 trim coil power supplies have been constructed and are now in place in the K500 pit and pit mezzanine. Final wiring of the primary power and control power is proceeding along with installation of cooling water supplies. The supplies are expected to be ready for final testing into resistive loads at the beginning of June, 1985
Additional details
Publishing Information
- Imprint Title
- Cyclotron-based nuclear science. Progress report, April 1, 1984-March 31, 1985
- Journal Page Range
- 90 p.
- Report number
- DOE/ER/10565--10
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 17040203
- Subject category
- S43: PARTICLE ACCELERATORS;
- Descriptors DEI
- MAGNET COILS; POWER SUPPLIES; SPECIFICATIONS; TEXAS A AND M CYCLOTRON
- Descriptors DEC
- ACCELERATORS; CYCLIC ACCELERATORS; CYCLOTRONS; ELECTRIC COILS; ELECTRICAL EQUIPMENT; ELECTRONIC EQUIPMENT; EQUIPMENT; ISOCHRONOUS CYCLOTRONS