Published December 1, 2009 | Version v1
Report

Rapid Cycling Synchrotron Option for Project X

Description

This paper presents an 8 GeV Rapid Cycling Synchrotron (RCS) option for Project X. It has several advantages over an 8 GeV SC linac. In particular, the cost could be lower. With a 2 GeV 10 mA pulsed linac as injector, the RCS would be able to deliver 4 MW beam power for a muon collider. If, instead, a 2 GeV 1 mA CW linac is used, the RCS would still be able to meet the Project X requirements but it would be difficult for it to serve a muon collider due to the very long injection time.

Availability note (English)

Available from http://lss.fnal.gov/cgi-bin/find_paper.pl?conf-09-615.pdf; PURL: https://www.osti.gov/servlets/purl/969511-5bnsW2/

Additional details

Publishing Information

Imprint Pagination
4 p.
Report number
FERMILAB-CONF--09-615-AD

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
41024945
Subject category
S43: PARTICLE ACCELERATORS; S71: CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSICS;
Resource subtype / Literary indicator
Non-conventional Literature
Descriptors DEI
LINEAR ACCELERATORS; MUONS; SYNCHROTRONS
Descriptors DEC
ACCELERATORS; CYCLIC ACCELERATORS; ELEMENTARY PARTICLES; FERMIONS; LEPTONS

Optional Information