Published 1996 | Version v1
Report Open

Ultra-high tritium decontamination of simulated fusion fuel exhaust using a 2-stage palladium membrane reactor

Description

A 2-stage cold (non-tritium) PMR system was tested with the ITER mix in61 days of continuous operation. No decrease in performance was observed over the duration of the test. Decontamination factor (DF) was found to increase with decreasing inlet rate. Decontamination factors in excess of 1.4 x 105 were obtained, but the exact value of the highest DF could not be determined because of analysis limitations. Results of the 61-day test were used to design a 2-stage PMR system for use in tritium testing. The PMR system was scaled up by a factor of 6 and built into a glovebox in the Tritium Systems Test Assembly (TSTA) of the Los Alamos National Laboratory. This system is approximately 1/5th of the expected full ITER scale. The ITER mix was injected into the PMR system for 31 hours, during which 4.5 g of tritium were processed. The 1st stage had DF = 200 and the 2nd stage had DF = 2.9 x 106. The overall DF = 5.8 x 108, which is greater than ITER requirements

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE97000116; NTIS; US Govt. Printing Office Dep.

Files

28070304.pdf

Files (188.5 kB)

Name Size Download all
md5:ac9681a2e23b9f994b6520a515871b1b
188.5 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
8 p.
Report number
LA-UR--96-3212

Conference

Title
4. international symposium on fusion nuclear technology.
Dates
6-11 Apr 1997.
Place
Tokyo (Japan).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
28070304
Subject category
S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
CATALYSTS; CHEMICAL REACTORS; DECONTAMINATION; EXHAUST SYSTEMS; ITER TOKAMAK; PALLADIUM; TRITIUM RECOVERY; TRITIUM SYSTEMS TEST ASSEMBLY
Descriptors DEC
CLEANING; CLOSED PLASMA DEVICES; ELEMENTS; METALS; PLATINUM METALS; TEST FACILITIES; THERMONUCLEAR DEVICES; THERMONUCLEAR REACTORS; TOKAMAK DEVICES; TOKAMAK TYPE REACTORS; TRANSITION ELEMENTS

Optional Information

Contract/Grant/Project number
Contract W-7405-ENG-36
Funding organization
USDOE, Washington, DC (United States).
Secondary number(s)
CONF-970404--1.