Published September 1983
| Version v1
Report
Restricted
Integrated plant-safety assessment, Systematic Evaluation Program: Big Rock Point Plant (Docket No. 50-155)
Description
The Systematic Evaluation Program was initiated in February 1977 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to reconfirm and document their safety. This report documents the review of the Big Rock Point Plant, which is one of ten plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. It also addresses a majority of the pending licensing actions for Big Rock Point, which include TMI Action Plan requirements and implementation criteria for resolved generic issues. Equipment and procedural changes have been identified as a result of the review
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS, PC A99/MF A01; 1 - GPO $13.00 as DE84900175.
Files
Additional details
Publishing Information
- Imprint Pagination
- 750 p.
- Report number
- NUREG--0828
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 15014059
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; S99: GENERAL AND MISCELLANEOUS;
- Descriptors DEI
- BIG ROCK POINT REACTOR; ENVIRONMENTAL IMPACTS; LEGAL ASPECTS; METEOROLOGY; REACTOR ACCIDENTS; REACTOR COMPONENTS; REACTOR LICENSING; REACTOR SAFETY; SAFETY ENGINEERING; STRESS ANALYSIS
- Descriptors DEC
- ACCIDENTS; BWR TYPE REACTORS; ENRICHED URANIUM REACTORS; LICENSING; POWER REACTORS; REACTORS; SAFETY; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS