Published December 1997 | Version v1
Miscellaneous Open

Annual report on the state of RB reactor components and equipment, December 1997

Creators

  • 1. Institute of Nuclear Sciences Vinca, Belgrade (Yugoslavia)

Description

According to the performed analysis, it is considered that the RB reactor can be operated safely until the existing control and safety systems could be maintained in satisfactory operable state. Failures of heavy water circulation system valves which may cause decreased availability but no accident. During 1997 the reactor lattice was not changed due to application of the coupled fast-thermal core HERBE. Total reactor operation amounted to 69.5 Wh with 66 start-ups (attained criticality levels). This report contains 4 Annexes, detailed description of the state of reactor equipment, plan for forming new HERBE core, plan for regular annual maintenance of the reactor, and plan for minimum needed resources for regular maintenance of the components and equipment in the forthcoming year

Availability note (English)

Available from INIS in electronic form; Also available from the Institute of nuclear sciences Vinca

Files

39043322.pdf

Files (356.6 kB)

Name Size Download all
md5:b89524f53075a30b471d92a6c8fdd769
356.6 kB Preview Download

Additional details

Additional titles

Original title (Serbian)
Godisnji izvestaj o stanju opreme reaktora RB, Decembar 1997. godine

Publishing Information

Imprint Place
Beograd-Vinca (Yugoslavia)
Imprint Pagination
20 p.
Report number
INIS-RS--1292

Optional Information

Notes
2 tabs.
Secondary number(s)
NET/RB-MM--97