Published 1989 | Version v1
Book

The vertical alignment of the DO overpass in the Fermilab Main Ring

Creators

  • 1. Fermi National Accelerator Laboratory, Batavia, IL (USA)

Description

In order to accommodate large detectors for pbar p physics at the Tevatron, the Main Ring has been modified to be non-planer in the sense of installing overpasses which create large vertical displacements of the beam orbit. The detailed placement of magnetic elements follows the screw geometry proposed by Tom Collins and implemented in a Fortran coded program, DSCREWF, by Sho Ohnuma. This program calculated the deviation of the new overpass from an assumed flat, perfectly aligned Main Ring. This paper describes the reality of working with the Main Ring as it was and fitting the new overpass into the overall pattern of the Main Ring. 4 refs., 6 figs., 1 tab

Additional details

Publishing Information

Publisher
Institute of Electrical and Electronics Engineers.
Imprint Place
New York, NY (USA)
Imprint Title
Proceedings of the 1989 IEEE (Institute of Electrical and Electronics Engineers) particle accelerator conference. Volume 3
Imprint Pagination
678 p.
Journal Page Range
p. 1957-1959.

Conference

Title
1989 IEEE particle accelerator conference.
Dates
20-23 Mar 1989.
Place
Chicago, IL (USA).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
21058969
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ALIGNMENT; BEAM INJECTION; BYPASSES; FERMILAB TEVATRON; MODIFICATIONS; ORBITS; QUADRUPOLES; SPATIAL DISTRIBUTION; SPECIFICATIONS; SYNCHROTRONS
Descriptors DEC
ACCELERATORS; CYCLIC ACCELERATORS; DISTRIBUTION; MULTIPOLES

Optional Information

Secondary number(s)
CONF-890335--Vol.3.