Published 1989
| Version v1
Book
The vertical alignment of the DO overpass in the Fermilab Main Ring
Description
In order to accommodate large detectors for pbar p physics at the Tevatron, the Main Ring has been modified to be non-planer in the sense of installing overpasses which create large vertical displacements of the beam orbit. The detailed placement of magnetic elements follows the screw geometry proposed by Tom Collins and implemented in a Fortran coded program, DSCREWF, by Sho Ohnuma. This program calculated the deviation of the new overpass from an assumed flat, perfectly aligned Main Ring. This paper describes the reality of working with the Main Ring as it was and fitting the new overpass into the overall pattern of the Main Ring. 4 refs., 6 figs., 1 tab
Additional details
Publishing Information
- Publisher
- Institute of Electrical and Electronics Engineers.
- Imprint Place
- New York, NY (USA)
- Imprint Title
- Proceedings of the 1989 IEEE (Institute of Electrical and Electronics Engineers) particle accelerator conference. Volume 3
- Imprint Pagination
- 678 p.
- Journal Page Range
- p. 1957-1959.
Conference
- Title
- 1989 IEEE particle accelerator conference.
- Dates
- 20-23 Mar 1989.
- Place
- Chicago, IL (USA).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 21058969
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- ALIGNMENT; BEAM INJECTION; BYPASSES; FERMILAB TEVATRON; MODIFICATIONS; ORBITS; QUADRUPOLES; SPATIAL DISTRIBUTION; SPECIFICATIONS; SYNCHROTRONS
- Descriptors DEC
- ACCELERATORS; CYCLIC ACCELERATORS; DISTRIBUTION; MULTIPOLES
Optional Information
- Secondary number(s)
- CONF-890335--Vol.3.