Published January 2001 | Version v1
Report

Development of cost-benefit analysis system

Description

In order to promote the FDR development, it is necessary to see various benefits brought by introduction of FBR from multiple perspectives and have a good grasp of such benefits quantitatively and an adequate R and D investment scale which corresponds with them. In this study, the structured prototype in the previous study was improved to be able to perform cost-benefit analysis. An example of improvement made in the system is addition of subroutine used for comparison between new energy and benefits brought by introduction of FBR with special emphasis on addition of logic for analyzing externality about the new energy. Other improvement examples are modification of the Conventional Year Expense Ratio method of power generation cost to Average Durable Year Cost method, addition of database function and turning input data into database, and reviewing idea on cost by the type of waste material and price of uranium. The cost-benefit analysis system was also restructured utilizing Microsoft ACCESS so that it should have a data base function. As the result of the improvement mentioned above, we expect that the improved cost-benefit analysis system will have higher generality than the system before; therefore, great deal of benefits brought by application of the system in the future is expected. (author)

Availability note (English)

Available from JICST Library (JICST: Japan Science and Technology Corporation, Information Center for Science and Technology), P.O. Box 10 Hikarigaoka, Tokyo 179-9810 Japan, FAX: +81-3-3979-4781, JICST Service Homepage: www.jst.go.jp/EN/

Additional details

Publishing Information

Imprint Pagination
155 p.
Report number
JNC-TJ--9400-2001-018

INIS

Optional Information

Notes
17 refs., 25 figs., 51 tabs.