Published September 1994 | Version v1
Report Open

U.S. Department of Energy Uranium Mill Tailings Remedial Action Ground Water Project: Project plan

Description

The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA Project processing sites. The compliance strategy for the processing sites must satisfy the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1987). This scope of work will entail the following activities on a site-specific basis: Develop a compliance strategy based on modification of the UMTRA Surface Project RAPs or develop Ground Water Project RAPs with NRC concurrence on the RAP and full participation of the affected states and tribes. Implement the RAP to include institutional controls, where appropriate, as an interim measure until compliance with the standards is achieved. Institute long-term verification monitoring for transfer to a separate long-term surveillance program on or before the Project end date. Prepare certification or confirmation reports and modify the long-term surveillance plan (LTSP), where needed, on those sites completed prior to the Project end date

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95001278; NTIS; US Govt. Printing Office Dep.

Files

26026817.pdf

Files (2.0 MB)

Name Size Download all
md5:426851c44b0d031598311ed59c12ce75
2.0 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
95 p.
Report number
DOE/AL/62350--61-Rev.1

Optional Information

Contract/Grant/Project number
Contract AC04-91AL62350
Funding organization
USDOE, Washington, DC (United States).