DOE's plan for buried transuranic (TRU) contaminated waste

  • 1. Dept. of Energy, Germantown, MD (USA)

Description

Prior to 1970, TRU-contaminated waste was buried as low-level radioactive waste. In the Defense Waste Management Plan issued in 1983, the plan for this buried TRU-contaminated waste was to monitor the buried waste, take remedial actions, and to periodically evaluate the safety of the waste. In March 1986, the General Accounting Office (GAO) recommended that the Department of Energy (DOE) provide specific plans and cost estimates related to buried TRU-contaminated waste. This plan is in direct response to the GAO request. Buried TRU-contaminated waste and TRU-contaminated soil are located in numerous inactive disposal units at five DOE sites. The total volume of this material is estimated to be about 300,000 to 500,000 m3. The DOE plan for TRU-contaminated buried waste and TRU-contaminated soil is to characterize the disposal units; assess the potential impacts from the waste on workers, the surrounding population, and the environment; evaluate the need for remedial actions; assess the remedial action alternatives; and implement and verify the remedial actions as appropriate. Cost estimates for remedial actions for the buried TRU-contaminated waste are highly uncertain, but they range from several hundred million to the order of $10 billion

Additional details

Publishing Information

Imprint Title
1987 Oak Ridge model conference. Proceedings: Volume I, Part 3, Waste Management
Journal Page Range
p. 13-25.
Report number
CONF-871075--Vol.1-Pt.3

Conference

Title
3. Oak Ridge model conference on waste problems.
Dates
13-16 Oct 1987.
Place
Oak Ridge, TN (USA).