Modelling of hydro and wind power in the regulation market
Creators
- 1. VTT Technical Research Centre of Finland, Espoo (Finland)
- 2. Risoe National Laboratory, Roskilde (Denmark)
Description
The amount of required regulation capacity in the power system is affected by the wind power prediction errors. A model has been developed which can evaluate the monetary effects of prediction errors. The model can be used to evaluate (1) the regulation costs of wind power, (2) regulation market prices including effects related to the participation of power producers in the regulating power market, (3) value of accurate wind forecasts and (4) the effect of decreasing the length of the spot market clearance. This article discusses the problems related to developing a realistic model of the regulating power market including the interaction between the spot market and the regulating power market. There are several issues that make things complicated. (1) How to calculate the minimum amount of needed secondary (minute) reserves. Traditionally the Nordic TSOs have used an N-1 criteria in each country to determine the required amounts of positive secondary reserve, but as installed wind power capacity grows, it will become relevant to include the wind power prediction errors in the estimation of secondary reserves. (2) Consumption forecast errors and plant outages also contribute to activation of regulating power and should have stochastic input series besides wind power. (3) Risk premiums and transaction costs in the regulating power market are difficult to estimate as well as the effects of the possible use of market power. This is especially true in the Nordic system with the high share of hydro power, since the water value and hydrological limitations make things more complex than in a thermal system. (4) The available regulation capacity is not necessarily equal to the truly available capacity. All producers don't participate in the regulation market although in principle they could. (orig.)
Additional details
Identifiers
Publishing Information
- Imprint Title
- NWPC'2006 - Grid integration and electrical systems on wind turbines and wind farms
- Imprint Pagination
- [319 p.]
- Journal Page Range
- p. 7
- Report number
- NEI-FI--423
Conference
- Title
- Nordic wind power conference - NWPC'2006
- Dates
- 22-23 May 2006
- Place
- Espoo (Finland)
INIS
- Country of Publication
- Finland
- Country of Input or Organization
- Finland
- INIS RN
- 38005843
- Subject category
- S17: WIND ENERGY; S13: HYDRO ENERGY;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- COST ESTIMATION; FLUCTUATIONS; FORECASTING; HYDROELECTRIC POWER; MARKET; MATHEMATICAL MODELS; POWER DEMAND; PRICES; REGULATIONS; SPOT MARKET; WIND POWER
- Descriptors DEC
- DEMAND; ELECTRIC POWER; ENERGY SOURCES; LAWS; MARKET; POWER; RENEWABLE ENERGY SOURCES; VARIATIONS