Published July 2007 | Version v1
Journal article

Means of improving the operating efficiency of air condensers at the Verkhne-Mutnovskaya Geothermal Power Plant in Kamchatka

  • 1. JSC 'Geoterm' (Russian Federation)
  • 2. Russian Academy of Sciences, Scientific-Research Geotechnical Center, Far East Branch (Russian Federation)

Description

Operation of the Verkhne-Mutnovskaya Geothermal Power Plant (VMGPP) has revealed ineffective summer-time performance of air condensers (AC), which is caused by an insufficient heat reserve. Four alternate schemes are examined for improvement of the operational efficiency of the AC: replacement of the four-by five-tier heat-exchange modules; installation of high-output fans; a combination of the first two schemes; and, installation of additional sections in each power-generating set. Based on thermodynamic analysis that we have adapted for conditions at the VMGPP, it is established that the last alternate scheme is optimal, andwill have a payback period of six years, and a heat reserve of more than 40%, a figure approaching requirements now in force

Additional details

Identifiers

Publishing Information

Journal Title
Power Technology and Engineering (Print)
Journal Volume
41
Journal Issue
4
Journal Page Range
p. 233-236
ISSN
1570-145X

INIS

Country of Publication
United States
Country of Input or Organization
International Atomic Energy Agency (IAEA)
INIS RN
39085816
Subject category
S42: ENGINEERING; S15: GEOTHERMAL ENERGY;
Descriptors DEI
AIR; BLOWERS; EFFICIENCY; GEOTHERMAL POWER PLANTS; HEAT; INSTALLATION; KAMCHATKA; OPERATION; PAYBACK PERIOD; PERFORMANCE
Descriptors DEC
EASTERN EUROPE; ENERGY; EUROPE; FLUIDS; GASES; POWER PLANTS; RUSSIAN FEDERATION; THERMAL POWER PLANTS

Optional Information

Copyright
Copyright (c) 2007 Springer Science+Business Media, Inc.