Means of improving the operating efficiency of air condensers at the Verkhne-Mutnovskaya Geothermal Power Plant in Kamchatka
- 1. JSC 'Geoterm' (Russian Federation)
- 2. Russian Academy of Sciences, Scientific-Research Geotechnical Center, Far East Branch (Russian Federation)
Description
Operation of the Verkhne-Mutnovskaya Geothermal Power Plant (VMGPP) has revealed ineffective summer-time performance of air condensers (AC), which is caused by an insufficient heat reserve. Four alternate schemes are examined for improvement of the operational efficiency of the AC: replacement of the four-by five-tier heat-exchange modules; installation of high-output fans; a combination of the first two schemes; and, installation of additional sections in each power-generating set. Based on thermodynamic analysis that we have adapted for conditions at the VMGPP, it is established that the last alternate scheme is optimal, andwill have a payback period of six years, and a heat reserve of more than 40%, a figure approaching requirements now in force
Additional details
Identifiers
Publishing Information
- Journal Title
- Power Technology and Engineering (Print)
- Journal Volume
- 41
- Journal Issue
- 4
- Journal Page Range
- p. 233-236
- ISSN
- 1570-145X
INIS
- Country of Publication
- United States
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 39085816
- Subject category
- S42: ENGINEERING; S15: GEOTHERMAL ENERGY;
- Descriptors DEI
- AIR; BLOWERS; EFFICIENCY; GEOTHERMAL POWER PLANTS; HEAT; INSTALLATION; KAMCHATKA; OPERATION; PAYBACK PERIOD; PERFORMANCE
- Descriptors DEC
- EASTERN EUROPE; ENERGY; EUROPE; FLUIDS; GASES; POWER PLANTS; RUSSIAN FEDERATION; THERMAL POWER PLANTS
Optional Information
- Copyright
- Copyright (c) 2007 Springer Science+Business Media, Inc.