Published August 1, 2011
| Version v1
Report
SPECTR System Operational Test Report
Description
This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.
Additional details
Identifiers
Publishing Information
- Imprint Pagination
- vp.
- Report number
- INL/EXT--11-22903
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 43002854
- Subject category
- S42: ENGINEERING;
- Resource subtype / Literary indicator
- Non-conventional Literature
- Descriptors DEI
- AVAILABILITY; DESIGN; FURNACES; TESTING
Optional Information
- Contract/Grant/Project number
- AC07-05ID14517
- Notes
- doi 10.2172/1027926
- Funding organization
- DOE - NE (United States)