Published August 1, 2011 | Version v1
Report

SPECTR System Operational Test Report

Description

This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.

Additional details

Publishing Information

Imprint Pagination
vp.
Report number
INL/EXT--11-22903

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
43002854
Subject category
S42: ENGINEERING;
Resource subtype / Literary indicator
Non-conventional Literature
Descriptors DEI
AVAILABILITY; DESIGN; FURNACES; TESTING

Optional Information

Contract/Grant/Project number
AC07-05ID14517
Notes
doi 10.2172/1027926
Funding organization
DOE - NE (United States)