Published October 15, 1992 | Version v1
Report Open

HFIR spent fuel management alternatives

Description

The High Flux Isotope Reactor (HFIR) at Martin Marietta Energy Systems' Oak Ridge National Laboratory (ORNL) has been unable to ship its spent fuel to Savannah River Site (SRS) for reprocessing since 1985. The HFIR storage pools are expected to fill up in the February 1994 to February 1995 time frame. If a management altemative to existing HFIR pool storage is not identified and implemented before the HFIR pools are full, the HFIR will be forced to shut down. This study investigated several alternatives for managing the HFIR spent fuel, attempting to identify options that could be implemented before the HFIR pools are full. The options investigated were: installing a dedicated dry cask storage facility at ORNL, increasing HFIR pool storage capacity by clearing the HFIR pools of debris and either close-packing or stacking the spent fuel elements, storing the spent fuel at another ORNL pool, storing the spent fuel in one or more hot cells at ORNL, and shipping the spent fuel offsite for reprocessing or storage elsewhere

Availability note (English)

MF available from INIS under the Report Number; OSTI as DE93003111; NTIS; INIS; US Govt. Printing Office Dep.

Files

24036314.pdf

Files (2.7 MB)

Name Size Download all
md5:fff5e517dad5f38ea0c39bb7a1756580
2.7 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
103 p.
Report number
ORNL/M--2377

Optional Information

Contract/Grant/Project number
Contract AC05-84OR21400
Funding organization
USDOE, Washington, DC (United States).