Analysis of fixed volume swaps for hedging financial risk at large-scale wind projects

  • 1. Department of Forestry and Environmental Resources, North Carolina State University, Raleigh, NC, 27695 (United States)

Description

Highlights: • Large scale wind power projects are increasingly seeking financial hedging contracts to mitigate exposure to price risk. • Fixed volume price swaps pose significant liabilities for wind power producers in the form of "shape risk" and "basis risk". • We identify alternative contract designs that are more effective at hedging at a lower cost than conventional fixed volume swaps. Large scale wind power projects are increasingly selling power directly into wholesale electricity markets without the benefits of stable (fixed price) off-take agreements. As a result, many wind power producers seek financial hedging contracts to mitigate exposure to price risk. One particular hedging contract - the "fixed volume price swap" - has gained widespread use, but it poses several liabilities for wind power producers that reduce its effectiveness. In this paper, we examine problems associated with fixed volume swaps and explore possibilities for improving their performance. Using a hypothetical wind power project in the Southwest Power Pool (SPP) market as a case study, we first look at how "shape risk" (an imbalance between actual wind power production and hourly production targets specified by contract terms) negatively impacts contract performance and whether this could be remedied through improved contract design. Using a multi-objective optimization algorithm, we find examples of alternative contract parameters (hourly wind power production targets) that are more effective at increasing revenues during low performing months and do so at a lower cost than conventional fixed volume swaps. Then we examine how "basis risk" (a discrepancy in market prices between the "node" where the wind project injects power into the grid, and the regional hub price) can negatively impact contract performance. Overall, our results suggest that wind power producers would be better served hedging substantially lower volumes of wind power production, and in certain months should not be hedging at all. Another key finding is that contract performance improves with modest reductions in basis risk. This indicates that eliminating transmission congestion issues across the grid may not be necessary to improve contract performance.

Availability note (English)

Available from http://dx.doi.org/10.1016/j.eneco.2021.105603

Additional details

Identifiers

DOI
10.1016/j.eneco.2021.105603;
PII
S0140988321004710;

Publishing Information

Journal Title
Energy Economics
Journal Volume
103
Journal Page Range
vp.
ISSN
0140-9883
CODEN
EECODR

INIS

Country of Publication
United Kingdom
Country of Input or Organization
International Atomic Energy Agency (IAEA)
INIS RN
53108019
Subject category
S29: ENERGY PLANNING, POLICY AND ECONOMY; S24: POWER TRANSMISSION AND DISTRIBUTION;
Descriptors DEI
COST; DESIGN; ELECTRICITY; MARKET; OPTIMIZATION; PERFORMANCE; POWER DISTRIBUTION SYSTEMS; POWER GENERATION; POWER TRANSMISSION; WIND POWER
Descriptors DEC
ENERGY SOURCES; POWER; RENEWABLE ENERGY SOURCES

Optional Information

Copyright
Copyright (c) 2021 Elsevier B.V. All rights reserved.