ADVANCEMENT OF THE RHIC BEAM ABORT KICKER SYSTEM
Description
As one of the most critical system for RHIC operation, the beam abort kicker system has to be highly available, reliable, and stable for the entire operating range. Along with the RHIC commission and operation, consistent efforts have been spend to cope with immediate issues as well as inherited design issues. Major design changes have been implemented to achieve the higher operating voltage, longer high voltage hold-off time, fast retriggering and redundant triggering, and improved system protection, etc. Recent system test has demonstrated for the first time that both blue ring and yellow ring beam abort systems have achieved more than 24 hours hold off time at desired operating voltage. In this paper, we report break down, thyratron reverse arcing, and to build a fast re-trigger system to reduce beam spreading in event of premature discharge
Availability note (English)
Available from PURL: https://www.osti.gov/servlets/purl/15006641-HF7G5E/native/Additional details
Identifiers
Publishing Information
- Imprint Pagination
- 3 p.
- Report number
- BNL--69627-CP
Conference
- Title
- 2003 PARTICLE ACCELERATOR CONFERENCE
- Dates
- 12-16 May 2003
- Place
- PORTLAND, OR (United States)
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 35030853
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- ACCELERATORS; BNL; BROOKHAVEN RHIC; DESIGN; THYRATRONS
- Descriptors DEC
- ACCELERATORS; ELECTRON TUBES; GAS DISCHARGE TUBES; HEAVY ION ACCELERATORS; NATIONAL ORGANIZATIONS; STORAGE RINGS; US AEC; US DOE; US ERDA; US ORGANIZATIONS
Optional Information
- Contract/Grant/Project number
- KB0202011; AC02-98CH10886
- Funding organization
- DOE/SC (United States)