Production of simultaneous, variable energy beams from the TRIUMF cyclotron
Description
An extracted beam at the design energy of 500 MeV was obtained at TRIUMF in December 1974. Later, beams of varying energies between 180 and 520 MeV were extracted own beam line 4, and further work resulted in the simultaneous extraction of a 506 MeV beam down beam line 1, while variable energy beams were brought down line 4. In order to reduce initial activation of cyclotron components, time average beams were restricted to 100 nA, but 12 μA in a pulsed beam was very easily obtained at 500 MeV. Without much optimization of the injection conditions and without use of the harmonic trim coils, an energy spread (full width) of 2.5 to 3.0 MeV was observed. Ordinarily, the macro-duty factor was 100 percent and the micro duty factor corresponds to a 5 ns pulse every 44 ns. The transmission to 500 MeV is consistent with the expected loss due to gas stripping. (U.S.)
Availability note (English)
MF available from INIS under the Report Number.Additional details
Publishing Information
- Imprint Pagination
- 6 p.
- Report number
- TRI-PP--75-1
Conference
- Title
- Particle accelerator conference.
- Dates
- 12 Mar 1975.
- Place
- Washington, District of Columbia, USA.
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 7223895
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- BEAM EXTRACTION; BEAM PRODUCTION; BEAM PROFILES; MESON FACTORIES; MEV RANGE 100-1000; MICRO AMP BEAM CURRENTS; RADIOACTIVATION; TRIUMF CYCLOTRON
- Descriptors DEC
- ACCELERATORS; BEAM CURRENTS; CURRENTS; CYCLIC ACCELERATORS; CYCLOTRONS; ENERGY RANGE; ISOCHRONOUS CYCLOTRONS; MEV RANGE
Optional Information
- Secondary number(s)
- CONF-750335--66.