Published 1996
| Version v1
Book
Fitness for service after a LOCA: A process applied to Pickering NGS Unit 2
Creators
- 1. Ontario Hydro, Pickering, Ontario (Canada). Pickering NGS
- 2. Ontario Hydro, Toronto, Ontario (Canada). Nuclear Technology Services
Description
The fitness for service process provides a unique proven methodology for assessing and correcting post-LOCA damage, essential to plant restart. The process uses the as-built plant configuration for modelling input and features self correcting feedback from inspection to validate assessment models. This paper focuses on the process steps and the infrastructure necessary to execute the process
Additional details
Publishing Information
- Publisher
- American Society of Mechanical Engineers.
- Imprint Place
- New York, NY (United States)
- ISBN
- 0-7918-1778-4
- Imprint Title
- Pressure vessels and piping design, analysis, and severe accidents. PVP-Volume 331
- Imprint Pagination
- 219 p.
- Journal Page Range
- p. 129-133.
Conference
- Title
- American Society of Mechanical Engineers (ASME) pressure vessels and piping conference.
- Dates
- 21-26 Jul 1996.
- Place
- Montreal (Canada).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 28023808
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- CORRECTIONS; LOSS OF COOLANT; PICKERING-2 REACTOR; REACTOR START-UP; SYSTEMS ANALYSIS
- Descriptors DEC
- ACCIDENTS; CANDU TYPE REACTORS; HEAVY WATER COOLED REACTORS; HEAVY WATER MODERATED REACTORS; NATURAL URANIUM REACTORS; PHWR TYPE REACTORS; POWER REACTORS; PRESSURE TUBE REACTORS; REACTOR ACCIDENTS; REACTORS; START-UP; THERMAL REACTORS
Optional Information
- Secondary number(s)
- CONF-960706--.