Published January 13, 1995 | Version v1
Report Open

Pig shipping container test sequence

Description

This test plan outlines testing of the integrity of the pig shipping container. It is divided into four sections: (1) drop test requirements; (2) test preparations; (3) perform drop test; and (4) post-test examination

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95006875; NTIS; US Govt. Printing Office Dep.

Files

26044882.pdf

Files (481.1 kB)

Name Size Download all
md5:07012fd2de5b85ae5bbfc35efe268153
481.1 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
9 p.
Report number
WHC-SD--TP-TP-005

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
26044882
Subject category
S42: ENGINEERING; S42: ENGINEERING;
Descriptors DEI
CASKS; PERFORMANCE TESTING; PLANNING; RADIOACTIVE WASTES; RELIABILITY; WASTE TRANSPORTATION
Descriptors DEC
CONTAINERS; MANAGEMENT; MATERIALS; RADIOACTIVE MATERIALS; TESTING; WASTE MANAGEMENT; WASTES

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930
Funding organization
USDOE, Washington, DC (United States).