Published August 2006
| Version v1
Miscellaneous
Excitation test and magnetic field measurement of the superconducting ring cyclotron
- 1. RIKEN, Nishina Center for Accelerator-Based Science, Wako, Saitama (Japan)
Description
Construction of the superconducting sector magnets for the SRC were completed in September 2005. After cooling down for one month, excitation of the superconducting main coils and trim coils succeeded at the nominal currents without quench. According to the measurement of the magnetic force acting on the coils during the excitation, stresses of the thermal insulating supports were within design values. Magnetic field measurements were carried out for two months to acquire the data for making the isochronous magnetic fields and the data of the magnetic perturbation from the beam injection and extraction elements. (author)
Additional details
Identifiers
- URL
- http://www.pasj.jp/;
Publishing Information
- Imprint Title
- The 3rd annual meeting of Particle Accelerator Society of Japan and the 31th Linear Accelerator Meeting in Japan. Proceedings
- Imprint Pagination
- 819 p.
- Journal Page Range
- p. 77-79
Conference
- Title
- 3. annual meeting of Particle Accelerator Society of Japan; 31. Linear Accelerator Meeting in Japan
- Dates
- 2-4 Aug 2006
- Place
- Sendai, Miyagi (Japan)
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 40085278
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- ACCELERATOR FACILITIES; BEAM BENDING MAGNETS; EXCITATION; IPCR CYCLOTRON; MAGNETIC FIELDS; MEASURING METHODS; PERFORMANCE TESTING; RINGS; START-UP; SUPERCONDUCTING COILS; SUPERCONDUCTING CYCLOTRONS
- Descriptors DEC
- ACCELERATORS; CYCLIC ACCELERATORS; CYCLOTRONS; ELECTRIC COILS; ELECTRICAL EQUIPMENT; ENERGY-LEVEL TRANSITIONS; EQUIPMENT; HEAVY ION ACCELERATORS; ISOCHRONOUS CYCLOTRONS; MAGNETS; TESTING
Optional Information
- Notes
- 2 refs., 8 figs., 1 tab.