Published April 1992 | Version v1
Report Open

Low Energy Ring issues

Description

The Low Energy Ring (LER) in an Asymmetric B Factory is always too large in circumference. The requirements for the LER in a B Factory are developed, including, damping, emittance and power density, and some examples of technical solutions are given. The main emphasis is on ensuring flexibility of operation

Availability note (English)

MF available from INIS under the Report Number; OSTI as DE92014069; NTIS; INIS; US Govt. Printing Office Dep.

Files

23067633.pdf

Files (286.2 kB)

Name Size Download all
md5:f3076804f29a25c610cf14dadff91896
286.2 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
7 p.
Report number
SLAC-PUB--5807

Conference

Title
state of the art in accelerators, detectors, and physics.
Acronym
B factories
Dates
6-10 Apr 1992.
Place
Stanford, CA (United States).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
23067633
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ASYMMETRY; B MESONS; BEAM CURRENTS; BEAM EMITTANCE; BEAM-BEAM INTERACTIONS; DAMPING; DESIGN; MESON FACTORIES; POWER DENSITY; SCALING LAWS; STORAGE RINGS; SYNCHROTRON RADIATION; TUNING; WIGGLER MAGNETS
Descriptors DEC
ACCELERATORS; BEAUTY PARTICLES; BOSONS; BREMSSTRAHLUNG; CURRENTS; ELECTROMAGNETIC RADIATION; ELEMENTARY PARTICLES; EQUIPMENT; HADRONS; MAGNETS; MESONS; PSEUDOSCALAR MESONS; RADIATIONS

Optional Information

Contract/Grant/Project number
Contract AC03-76SF00515
Funding organization
USDOE, Washington, DC (United States).
Secondary number(s)
CONF-9204126--1.