Filters
Results 1 - 10 of 298
Results 1 - 10 of 298.
Search took: 0.018 seconds
Sort by: date | relevance |
Nakayama, Kazunori; Yanagida, Tsutomu T., E-mail: kazunori@hep-th.phys.s.u-tokyo.ac.jp
arXiv e-print [ PDF ]2013
arXiv e-print [ PDF ]2013
AbstractAbstract
[en] We show that in supersymmetric axion models the axion supermultiplet obtains a sizable F-term due to a non-supersymmetric dynamics and it generally gives the gaugino masses comparable to the anomaly mediation contribution. Thus the gaugino mass relation predicted by the anomaly mediation effect can be significantly modified in the presence of axion to solve the strong CP problem
Primary Subject
Source
S0370-2693(13)00281-5; Available from http://dx.doi.org/10.1016/j.physletb.2013.04.002; Copyright (c) 2013 Elsevier Science B.V., Amsterdam, The Netherlands, All rights reserved.; Country of input: International Atomic Energy Agency (IAEA)
Record Type
Journal Article
Journal
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] In connection with the procedure in contentious matters over the SNR 300, the chairman of the 7th senate of the Higher Administrative Court at Muenster has sent participants in the procedure a document, in which it is pointed out that in order to come to a decision in the law case in question within the framework of dutiful exercise of the judicial right of control, the constitutional character of section 7 of the Atomic Energy Act would have to be examined and also, whether the principles of basic law would be still warranted if the executive, and not parliament, makes decisions with considerable consequences (ultimate storage, plutonium industry, etc.) - Note: The matter was passed on to the Federal Constitutional Court on the 18th August 1977 in order that the constitutional character of section 7 of the Atomic Energy Act may be examined. (orig./HP)
[de]
Im Verwaltungsstreitverfahren um den SNR 300 hat der Vorsitzende des 7. Senats am Oberverwaltungsgericht Muenster den Prozessbeteiligten ein Schriftstueck zugehen lassen, in dem darauf hingewiesen wird, dass fuer die Entscheidung im vorliegenden Rechtsstreit im Rahmen der pflichtgemaessen Ausuebung richterlichen Pruefungsrechts die Verfassungsmaessigkeit des Paragraphen 7 AtG zu pruefen und weiter zu untersuchen sei, ob Leitideen des Grundgesetzes noch gewaehrt seien, wenn die Exekutive anstelle des Parlaments Entscheidungen mit erheblichen Folgewirkungen (Endlagerung, Plutoniumwirtschaft etc.) treffe. Anmerkung: Am 18.8.1977 wurde die Angelegenheit zur Pruefung der Verfassungsmaessigkeit des Paragraphen 7 AtG dem Bundesverfassungsgericht weitergeleitet. (orig./HP)Original Title
OVG Muenster aeussert Zweifel an der Verfassungsmaessigkeit des Paragraphen 7 AtG
Primary Subject
Secondary Subject
Record Type
Journal Article
Journal
GRS (Ges. Reaktorsicherheit) Kurz-Inf., Reihe E; (no. 19); p. 1-2
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] The administrative court at Wuerzburg, in its decision of March 25th, 1977 - No. W 122 II 74 - has rejected the suit of the community of Bergrheinfeld against the licence for the construction of the Kernkraftwerk Grafenrheinfeld, and awarded costs of the proceedings, extra-judicial costs of two parties asked to attend included, against the plaintiff. The value in litigation was put at 75,000 DM. The rejection of the suit is based on missing the deadline for raising objections according to subsection (1) of section 3 of the AtAnlV (Nuclear Installations Ordinance). The main grounds upon which the judgment is based (admissibility of the action, but no foundation for it) are given in full. (orig./HP)
[de]
Das Verwaltungsgericht Wuerzburg hat mit Urteil vom 25.3.1977 - Nr. W 122 II 74 - die Klage der Gemeinde Bergrheinfeld gegen die Genehmigung der Errichtung des Kernkraftwerks Grafenrheinfeld abgewiesen und der Klaegerin die Kosten des Verfahrens einschliesslich der aussergerichtlichen Kosten der beiden Beigeladenen auferlegt. Der Streitwert wurde auf 75,000 DM festgesetzt. Die Abweisung der Klage ist auf die Versaeumung der Einwendungsfrist nach Paragraph 3 Abs. 1 AtAnlV gestuetzt. Die wesentlichsten Entscheidungsgruende (Klagezulaessigkeit, aber Nichtbegruendung) sind im Wortlaut wiedergegeben. (orig./HP)Original Title
Bei Versaeumung der Einwendungsfrist materielle Praeklusion
Primary Subject
Secondary Subject
Record Type
Journal Article
Journal
Energiewirtschaftliche Tagesfragen; v. 27(7); p. 528-531
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
No abstract available
Original Title
Bekanntmachung ueber einen Termin zur Eroerterung von Einwendungen gegen Aenderungen fuer das Gemeinschaftskernkraftwerk Neckar, Block II (GKN II)
Primary Subject
Secondary Subject
Source
Published in summary form only.; CODEN: BDZRA.
Record Type
Journal Article
Journal
Bundesanzeiger; ISSN 0344-7634;
; v. 36(120); p. 6512

Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
No abstract available
Original Title
Eroerterungstermin fuer das geplante Kernkraftwerk Vahnum abgesetzt
Primary Subject
Source
Short communication only.
Record Type
Journal Article
Journal
GRS (Ges. Reaktorsicherheit) Kurz-Inf., Reihe E; (no. 4); p. 1
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] In the case of the examination of the constituionality of section 7 Atomic Energy Act, in as far as this article enables the licensing of nuclear power plants of the type called Fast Breeder, the Second Senate of the Federal Constitutional Court has answered the OVG Muenster's motion to stay proceedings dated Aug 18th, 1977, with the following 'interim decision' - 2 B v L 8/77 - dated Jan 31st, 1978: 'The action is admissible'. The verdict was unanimous. The main grounds upon which the interim judgment is based are given in full. (orig./HP)
[de]
In dem Verfahren zur Pruefung der Verfassungsmaessigkeit des Paragraphen 7 des Atomgesetzes, soweit diese Bestimmung die Genehmigung von KKW des Typs des sog. Schnellen Brueters ermoeglicht, hat auf den Aussetzungs- und Vorlagebeschluss des OVG Muenster vom 18.8.1977 der Zweite Senat des Bundesverfassungsgerichts mit Beschluss vom 31.1.1978, 2 B v L 8/77 - folgende 'Zwischenentscheidung' getroffen: 'Die Vorlage ist zulaessig'. Die Entscheidung erging einstimmig. Die wesentlichsten Gruende des Zwischenentscheids sind im Wortlaut wiedergegeben. (orig./HP)Original Title
Bundesverfassungsgericht bejaht Zulaessigkeit des Vorlagebeschlusses in Sachen Schneller Brueter Kalkar
Primary Subject
Secondary Subject
Source
3 refs.
Record Type
Journal Article
Journal
Energiewirtschaftliche Tagesfragen; v. 28(4); p. 265
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] The party submitting the application is a group of lawyers representing third persons who have raised objections in the course of a nuclear licensing procedure for the Muelheim-Kaerlich nuclear power station. Applicants were denied access to a public hearing unless they agreed to a personal search and search of their brief cases. Upon application to set aside, the higher administrative court already during the running public hearing imposed the obligation on the ministry to allow the lawyers unimpeded access to the public hearing. The headnotes of the court decision read as follows: (1) Administrative courts have original jurisdiction in disputes about the scope of rights of a lawyer representing a party in a nuclear licensing procedure. (2) Lawyers are entitled to assert their right to unimpeded exercise of profession (Art. 12, I 2 GG) already during an administrative procedure by means of legal remedies, including provisional order. (3) It is an infringement of the right to unimpeded exercise of profession if a lawyer is allowed access to a hearing under atomic energy law only after personal search and search of the brief case. (Koblenz Higher Administrative Court, decision of 30 August 1989 - 7 B II 3/89). (orig./HP)
[de]
Die Ast. sind Rechtsanwaelte und vertreten in einem atomrechtlichen Genehmigungsverfahren fuer das KKW Muelheim-Kaerlich Einwendungen. Den Ast. wurde der Zutritt zu dem atomrechtlichen Eroerterungstermin nur unter der Voraussetzung gestattet, dass sie sich einer manuellen Leibeskontrolle sowie einer Sichtkontrolle ihrer mitgebrachten Aktenkoffer unterziehen. Auf die Beschwerde der Ast. verpflichtete das OVG das Ministerium noch waehrend des laufenden Eroerterungstermins dazu, den Ast. ungehinderten Zugang zu dem Eroerterungstermin zu gewaehren. 1. Ueber den Umfang der Rechte, die einem Rechtsanwalt in einem atomrechtlichen Genehmigungsverfahren zustehen, entscheidet im ersten Rechtszug das Verwaltungsgericht. 2. Rechtsanwaelte koennen ihr Recht auf ungehinderte Berufsausuebung (Art. 12 I 2 GG) bereits waehrend eines Verwaltungsverfahrens durch Rechtsbehelfe geltend machen und gegebenenfalls mit einer einstweiligen Anordnung durchsetzen. 3. Es verletzt den Grundsatz der freien Berufsausuebung, wenn einem Rechtsanwalt der Zutritt zu einem atomrechtlichen Eroerterungstermin nur nach Leibeskontrolle und Durchsuchung der Aktenkoffer gestattet wird. (Leitsaetze der Redaktion). (OVG Koblenz, Beschl. v. 30.8.1989 - 7 B II 3/89). (orig./HP)Original Title
Ungehinderte Berufsausbildung von Rechtsanwaelten waehrend eines laufenden Verwaltungsverfahrens - hier: im Atomrecht
Primary Subject
Secondary Subject
Record Type
Journal Article
Journal
Neue Zeitschrift fuer Verwaltungsrecht; CODEN NZVED; v. 8(12); p. 1178
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] The British minister of the environment ordered at the beginning of 1977 a public hearing to be held in connection with the extension of the British Nuclear Fuel's (BNFL) reprocessing plant at Windscale by a new plant for oxidic fuel elements. The hearing lasted from the middle of June until October 1977. It aroused worldwide interest on account of the procedure (witnesses for the applicant and for the opponents were cross-examined by independent solicitors in front of an independent judge, and had to give evidence under oath) and on account of the fact that the investigation was not restricted to questions concerning risk and environment, the plant itself, the site and the reprocessing procedure, but also dealt with the fundamental question whether there would be any need for reprocessing at all. The results are published in a three-volume report. This is a German translation of chapter 17, the summary of the main conclusions and recommendations. (orig./HP)
[de]
Der britische Umweltminister ordnete Anfang 1977 eine oeffentliche Anhoerung fuer die die von der British Nuclear Fuel (BNFL) geplante Erweiterung ihrer Wiederaufarbeitungsanlage in Windscale um eine neue Anlage fuer oxidische Brennelemente an, die von Mitte Juni bis Oktober 1977 dauerte. Die Anhoerung erregte weltweites Interesse wegen ihrer Dauer und ihres Umfangs, wegen ihres Verfahrens, bei dem vor einem unabhaengigen Richter Zeugen fuer Antragsteller und Einwender durch unabhaengige Rechtsanwaelte ins Kreuzverhoer genommen werden konnten und unter Eid aussagen mussten, sowie durch die Tatsache, dass sich die Untersuchung ueber Risiko- und Umweltfragen sowie detaillierte Einzelheiten der Anlage, des Standorts und des Wiederaufarbeitungsverfahrens hinaus auf Grundsatzfragen der Notwendigkeit der Wiederaufarbeitung ueberhaupt erstreckte. Die Ergebnisse liegen in einem dreibaendigen Bericht vor. In deutscher Uebersetzung sind im Wortlaut Kap. 17, die Zusammenfassung der wichtigsten Schlussfolgerungen und Empfehlungen wiedergegeben. (orig./HP)Original Title
Der Parker-Bericht zur britischen Wiederaufbereitungsanlage Windscale
Primary Subject
Record Type
Journal Article
Journal
Atomwirtsch., Atomtech; v. 23(5); p. 250-252
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] Development of the U.S.-Canadian natural gas market as it is today and the issues that may arise in cross-border transactions involving natural gas contracts between the two countries are reviewed. In this context, the paper reviews recent history of U.S.-Canadian trade relations culminating in the development of NAFTA, the U.S. regulatory and legislative framework surrounding cross-border natural gas transactions, and general U.S. foreign trade policy that may come into play at the U.S.- Canada border. The paper also examines certain issues arising in the U.S. commercial context that may be of interest to Canadian corporations, specifically the U.S. Uniform Commercial Code, state jurisdiction on the U.S. side of the border, state and federal tax concerns, and the mechanics and potential benefits for a Canadian parent company in forming a U.S.-based subsidiary to handle U.S.-Canada natural gas transactions. 71 refs
Primary Subject
Source
nsight Information Services Ltd., Toronto, ON (Canada); 501 p; ISBN 1-55264-165-1;
; 1999; p. 115-153; Insight Press; Toronto, ON (Canada); Insight conference on new developments affecting natural gas sales contracts; Calgary, AB (Canada); 22-23 Nov 1999; Available from Insight Press, 55 University Avenue, Suite 1800, Toronto, ON, Canada, M5J 2V6 or through interlibrary loan from the CANMET Information Centre, 555 Booth St., Ottawa, ON, tel: (613) 995-4157 or FAX: (613) 995-8730

Record Type
Book
Literature Type
Conference
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
No abstract available
Original Title
Bekanntmachung ueber das Vorhaben der Firma NUKEM G.m.b.H., Hanau-Wolfgang, eine Brennelementfabrik NUKEM Gebaeude 2 zu errichten und zu betreiben
Primary Subject
Secondary Subject
Source
Published in summary form only.; CODEN: BDZRA.
Record Type
Journal Article
Journal
Bundesanzeiger; ISSN 0344-7634;
; v. 35(181); p. 10588

Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
1 | 2 | 3 | Next |