Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.014 seconds
AbstractAbstract
[en] If the decision of the OVG Muenster to present the case to the Federal Constitutional Court asking whether Article 7 of the atomic energy law corresponds to the constitution or not, as far as the article allows the licensing of a fast breeder reactor, two problems arise: The legal question in how far the actual controlling of standards is to be preceeded by a statement of facts given by the court of first instance, and the problem behind concerning the responsibility of decision. The Federal Constitutional Court should accept the responsibility of decision to be borne by it. (orig.)
[de]
Bei der Zulaessigkeit des Vorlagebeschlusses des OVG Muenster an das BVerfG wegen der Verfassungsmaessigkeit von Paragraph 7 AtomG, soweit er die Genehmigung eines 'Schnellen Brueters' ermoeglicht, stellen sich zwei Probleme: Die Rechtsfrage, inwieweit einer konkreten Normenkontrolle eine Sachaufklaerung durch das Instanzgericht voranzugehen hat, und das dahinterstehende Problem der Entscheidungsverantwortung. Das BVerfG sollte die von ihm zu tragende Entscheidungsverantwortung uebernehmen. (orig.)Original Title
Zur konkreten Normenkontrolle beim 'Schnellen Brueter'
Primary Subject
Secondary Subject
Record Type
Journal Article
Journal
Oeffentliche Verwaltung; (no. 8); p. 277-282
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue