Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.015 seconds
AbstractAbstract
[en] According to the Annual Report by the ABE Committee of the Deutsches Atomforum, German nuclear power plants were able in 1977 to raise their electricity generation from 24.8 TWh in 1976 to 36.0 TWh, i.e., by 46%, although the only nuclear plant newly commissioned in 1977 (KKI, 907 MWe) did not feed electricity into the grid until December. However, the nuclear generating capacity of 2960 MW added in 1976 had a positive effect. Among the commercial nuclear power plants whose performance results are covered in detail, together with plant diagrams; in the second part of the report in this issue, above all KKS with an availability in terms of time of 94%, Biblis B with 86%, and KWW with 81% achieved excellent results. (orig.) 891 UA
[de]
Obwohl die installierte Kernkraftwerksleistung in der Bundesrepublik Deutschland 1977 keinen Zuwachs erhielt, da das einzige neue Kernkraftwerk erst im Dezember in Betrieb ging, stieg die Bruttostromerzeugung der Kernkraftwerke um 46% auf 36 TWh, da sich die 1976 neu in Betrieb gegangenen Anlagen nunmehr voll auswirkten. In Auszuegen aus dem Jahresbericht des ABE-Ausschusses werden, wie jedes Jahr, die wichtigsten Betriebsergebnisse der einzelnen Anlagen dargestellt. Nachdem im Septemberheft im ersten Teil die Demonstrations- und Versuchskraftwerke behandelt wurden, umfasst der Teil II die industriellen Kernkraftwerksbloecke. (orig.)Original Title
Betriebsergebnisse der deutschen Kernkraftwerke 1977. T. 2
Primary Subject
Record Type
Journal Article
Journal
Atomwirtsch., Atomtech; v. 23(10); p. 475-484
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue