Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.026 seconds
Ajuria G, S.; Blanco P, B.; Pena A, J.; Manzanera Q, C.
Instituto Nacional de Energia Nuclear, Mexico City1978
Instituto Nacional de Energia Nuclear, Mexico City1978
AbstractAbstract
[en] Activities comprising the development of a project for a mining-metallurgical complex for production of uranium concentrates, from sampling and evaluation of an orebody until plant start-up, are analyzed. The analysis of the orebody, characterization of the ore, bench scale and pilot plant metallurgical studies, environmental studies and economic analyses of the project are described. The mining project and mine preparation and engineering and construction of the plant are reviewed in less detail. The estimated time lapse for the development of a typical project under ideal conditions is 66 months. A bar diagram is included showing an approximate timetable for each activity. (author)
Original Title
Desarrollo de proyectos para unidades minero-metalurgicas para produccion de concentrados de uranio - an analisis y una metodologia
Primary Subject
Source
Oct 1978; 170 p
Record Type
Miscellaneous
Literature Type
Progress Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue