Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.039 seconds
AbstractAbstract
[en] A 3 GeV proton Synchrotron is now under completion at the Saclay Nuclear Research Center in France. This machine replaces the former Saturne Synchrotron built in 1958. The lattice type of the new machine is a strong focusing one, and the structure of the magnetic ring is made up of 16 bending magnets and 24 quadrupolar lenses. Due to the small injection energy (20 MeV), it has been necessary to design large aperture magnets. The two accelerating R.F. cavities need a wide range of tuning by ferrites from 0,86 to 8,3 MHz with a peak voltage of 18 kV. The performances of the new machine are better adaptated to the needs of Nuclear Physics. The main features of the extracted protons beam are an intensity of 2.1012 protons per second at a variable energy from 0,5 to 3 GeV, an energy spread of a few 10-4 and a small emittance (horizontal approximately 6 π mm.mrd, vertical 25 π mm.mrd). Heavy ions up to N7+ and polarized particles (H+ and D+) will be accelerated too, around 109 per pulse on the target. On the experimental areas nine lines are fully equipped and four spectrometers will be set up. The first accelerated beam is expected in October 1978, and the physics experiments should start at the end of this year
Primary Subject
Source
1978; 7 p; 22. conference of electronics, telecommunication, automation and nuclear engineering; Zadar, Yugoslavia; 12 - 16 Jun 1978
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue