Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.026 seconds
Fazio, M.V.; Johnson, H.P.; Hoffert, W.J.; Boyd, T.J.
Los Alamos Scientific Lab., NM (USA)1979
Los Alamos Scientific Lab., NM (USA)1979
AbstractAbstract
[en] Preliminary rf system design for the accelerator portion of the Fusion Materials Irradiation Test (FMIT) Facility is in progress. The 35-MeV, 100-mA, cw deuteron beam will require 6.3 MW rf power at 80 MHz. Initial testing indicates the EIMAC 8973 tetrode is the most suitable final amplifier tube for each of a series of 15 amplifier chains operating at 0.5-MW output. To satisfy the beam dynamics requirements for particle acceleration and to minimize beam spill, each amplifier output must be controlled to +-10 in phase and the field amplitude in the tanks must be held within a 1% tolerance. These tolerances put stringent demands on the rf phase and amplitude control system
Primary Subject
Secondary Subject
Source
1979; 4 p; IEEE particle accelerator conference; San Francisco, CA, USA; 12 - 14 Mar 1979; CONF-790327--31; Available from NTIS., PC A02/MF A01
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue