Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.016 seconds
Linde, A. van der; Lucas Luyckx, H.J.B.; Verheugen, J.H.N.
Stichting Energieonderzoek Centrum Nederland, Petten1979
Stichting Energieonderzoek Centrum Nederland, Petten1979
AbstractAbstract
[en] Three fuel pin bundles, R-109/1, 2 and 3, were irradiated in a PWR loop in the HFR at Petten during respectively 131, 57 and 57 effective full power days. Irradiation of the pins was performed at an average linear power of about 390 W/cm and at a peak linear power of about 610 W/cm. The results of the post-irradiation examinations are given
Primary Subject
Secondary Subject
Source
Jun 1979; 81 p; 32 figs., 9 refs., 7 tables.
Record Type
Report
Literature Type
Numerical Data
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue