Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.016 seconds
AbstractAbstract
[en] The Limiting Factors Analysis of a high availability nuclear plant are reported herein following a detailed study of two and one-half years of mature plant operation of the Maine Yankee Atomic Power Plant. The study plant is an 800 MWe PWR, with an NSSS design by Combustion Engineering (C-E) and a Balance of Plant design by Stone and Webster (S and W). C-E was prime contractor to EPRI for this study and S and W a subcontractor. Field engineers from C-E and S and W were stationed at the plant site for eighteen months of detailed data gathering. The data were computerized and sorted to obtain the quantitative results of the study in terms of systems and components which caused lost generation
Primary Subject
Source
Aug 1979; 536 p; Available from NTIS., PC A23/MF A01
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue