Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.016 seconds
Federick, L.G.; Brady, R.M.; Shor, S.W.W.; McCusker, J.T.; Alden, W.M.; Kovacs, S.
General Electric Co., San Jose, CA (USA). Nuclear Energy Engineering Div.; Bechtel National, Inc., San Francisco, CA (USA); Philadelphia Electric Co., PA (USA)1979
General Electric Co., San Jose, CA (USA). Nuclear Energy Engineering Div.; Bechtel National, Inc., San Francisco, CA (USA); Philadelphia Electric Co., PA (USA)1979
AbstractAbstract
[en] The pertinent result are presented of a 16-month study conducted for Electric Power Research Institute by General Electric Company, Bechtel Power Corporation, and Philadelphia Electric Company. The study centered around the Peach Bottom 2 Atomic Power Station, but also included limited study of operations at 20 additional operating boiling water reactors. The purpose of the study was to identify and evaluate key factors limiting plant availability, and to identify potential improvements for eliminating or alleviating those limitations. The key limiting factors were found to be refueling activities; activities related to the reactor fuel; reactor scrams; activities related to 20 operating systems or major components; delays due to radiation, turbid water during refueling operations, facilities/working conditions, and dirt/foreign material; and general maintenance/repair of valves and piping. Existing programs to reduce the effect on plant unavailability are identified, and suggestions for further action are made
Primary Subject
Source
Aug 1979; 340 p; Available from NTIS., PC A15/MF A01
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue