Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.014 seconds
Barrett, R.J.; Thomson, S.L.
Oak Ridge National Lab., TN (USA); Bechtel Group, Inc., San Francisco, CA (USA)1981
Oak Ridge National Lab., TN (USA); Bechtel Group, Inc., San Francisco, CA (USA)1981
AbstractAbstract
[en] Design and construction of a satisfactory tokamak building to support FED appears feasible. Further, a pressure vessel building does not appear necessary to meet the plant safety requirements. Some of the building functions will require safety class systems to assure reliable and safe operation. A rectangular tokamak building has been selected for FED preconceptual design which will be part of the confinement system relying on ventilation and other design features to reduce the consequences and probability of radioactivity release
Primary Subject
Source
1981; 4 p; 9. symposium on engineering problems of fusion research; Chicago, IL, USA; 26 - 29 Oct 1981; Available from NTIS., PC A02/MF A01
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue