Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.015 seconds
Planchon, H.P. Jr.; Kaushal, N.N.; Snider, J.
Westinghouse Electric Corp., Oak Ridge, TN (USA). Advanced Reactors Div.; Clinch River Breeder Reactor Plant Project Office, Oak Ridge, TN (USA); Tennessee Univ., Knoxville (USA)1982
Westinghouse Electric Corp., Oak Ridge, TN (USA). Advanced Reactors Div.; Clinch River Breeder Reactor Plant Project Office, Oak Ridge, TN (USA); Tennessee Univ., Knoxville (USA)1982
AbstractAbstract
[en] The Clinch River Breeder Reactor Plant (CRBRP) Project formed a Control Room Task Force to ensure that lessons learned from the Three Mile Island accident are incorporated into the design. The charter for the Control Room Task Force was to review plant operations from the control room. The focus was on the man-machine interface to ensure that the systems' designs and operator actions meshed to properly support plant operation during normal and off-normal conditions. Specific items included for review are described. This paper describes the methodology utilized to accomplish the Task Forces' objectives and the results of the review
Primary Subject
Source
1982; 4 p; American Nuclear Society topical conference; Charleston, SC, USA; 18 - 23 Mar 1982; Available from NTIS., PC A02/MF A01 as DE82002910
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue