Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.018 seconds
AbstractAbstract
[en] At Oak Ridge we are now in the final stages of completion of our heavy ion project. The facility, has as its centerpiece the 25MV Pelletron built by National Electrostatics Corporation. At the time of this writing (March 1982), the only tasks remaining for completion are the acceptance tests with beam to be performed at the design rating of 25MV on terminal. Along with the 20MV machine at Tokai and the 20MV machine at Buenos Aires, this trio of accelerators represents the new generation of Super-tandems presently in various stages of completion by NEC. In this paper, I shall review briefly some of the history of the work on the 25MV accelerator at Oak Ridge. In doing so, I will try to bring out those points that I feel are most illustrative of what may be expected as installation proceeds on the machine here in Argentina. Finally, as time permits, I'll discuss some of the other features of the Holifield Facility
Primary Subject
Source
1982; 36 p; 5. nuclear physics workshop; Buenos Aires (Argentina); 12 - 17 Apr 1982; Available from NTIS., PC A03/MF A01 as DE82013459
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue