Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.019 seconds
Purcell, W.J.; Martin, E.M.; Shivley, J.M.
Westinghouse Electric Corp., Oak Ridge, TN (USA). Advanced Reactors Div.; Stone and Webster Engineering Corp., New York (USA)1982
Westinghouse Electric Corp., Oak Ridge, TN (USA). Advanced Reactors Div.; Stone and Webster Engineering Corp., New York (USA)1982
AbstractAbstract
[en] The construction schedule for the Clinch River Breeder Reactor Plant and its evolution are described. The initial schedule basis, changes necessitated by the evaluation of the overall plant design, and constructability improvements that have been effected to assure adherence to the schedule are presented. The schedule structure and hierarchy are discussed, as are tools used to define, develop, and evaluate the schedule
Primary Subject
Source
1982; 8 p; 2. joint ASME/ANS nuclear engineering conference; Portland, OR (USA); 25 - 28 Jul 1982; Available from NTIS. MF A01 as DE82013030
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue