Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.017 seconds
Thomas, C.C. Jr.; Ford, W.; Hsue, S.T.; Marshall, R.S.
Los Alamos National Lab., NM (USA)1982
Los Alamos National Lab., NM (USA)1982
AbstractAbstract
[en] During FY 1981 the TA-55 Implementation Support Project provided assistance to the Los Alamos Plutonium Facility in materials accounting and control, including testing and evaluation of a solution mass measurement system, development and testing of a low-level plutonium assay system, holdup measurements, instrument design, and advice and consultation following the observation of semiannual inventories. This report describes the program envisioned for FY 1982, including demonstration of the solution mass measurement system and the associated calibration system, extension of the low-level plutonium assay system to solutions with americium/plutonium ratios of 10: to 20:1, and development and demonstration of a method to calibrate and routinely verify the plutonium oxalate assay instrument performance. The FY 1982 program is subject to changes based on TA-55 reevaluation of facility needs
Primary Subject
Source
May 1982; 11 p; Available from NTIS., PC A02/MF A01 as DE82016374
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue