Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.018 seconds
AbstractAbstract
[en] This report describes the activities conducted during the Preliminary Design Period for the Device Utilities Systems. All GAI preliminary specifications, drawings, and reports (listed in Section 4.0) have been transmitted to ORNL for review and approval. Device Utility Systems Descriptions are also presented in Section 4.0. The GAI Device Enclosure Gamma Radiation Analysis is presented in Appendix B. Pending design criteria revisions are described in Section 6.0. A type B Change Notice Request (CNR) has been transmitted to GAI. The Type B CNR authorizes cost and schedule assessment for each revision identified. Formal Proposed Design Changes (PDC's) will be provided to ORNL when this data is available
Primary Subject
Source
26 Feb 1982; 214 p; Available from NTIS, PC A10/MF A01 as DE83001872
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue