Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.027 seconds
AbstractAbstract
[en] The Safety Evaluation Report for the application filed by General Electric Company for the Final Design Approval for the General Electric Standard Safety Analysis Report (GESSAR II FSAR) has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. This report summarizes the results of the staff's safety review of the GESSAR II BWR/6 Nuclear Island Design. Subject to favorable resolution of items discussed in the Safety Evaluation Report, the staff concludes that the facilities referencing GESSAR II, subject to approval of the balance-of-plant design, can conform with the provisions of the Act and the regulations of the Nuclear Regulatory Commission
Primary Subject
Secondary Subject
Source
Apr 1983; 455 p; Available from NTIS, PC A20/MF A01 - GPO $11.00 as DE83901662
Record Type
Report
Report Number
Country of publication
CONTROL ROOMS, GE STANDARD REACTOR, LEGAL ASPECTS, POWER SUPPLIES, PRIMARY COOLANT CIRCUITS, QUALITY ASSURANCE, RADIATION PROTECTION, REACTOR ACCIDENTS, REACTOR COMPONENTS, REACTOR COOLING SYSTEMS, REACTOR INSTRUMENTATION, REACTOR OPERATION, REACTOR SAFETY, REACTOR SITES, SAFETY ENGINEERING, SEISMIC EFFECTS, STEAM
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue