Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.016 seconds
AbstractAbstract
[en] This speech discusses safety issues facing nuclear power generation in terms of their contribution to increased costs of construction. The view is advanced that improvements in regulatory methods could be achieved by improvements in probabilistic risk assessment. The major deficiency in risk assessment is that the consequence assessments are not realistic and accident consequences not well understood. It is demonstrated that realistic modelling of evacuation times and other emergency preparedness capabilities can significantly reduce the calculated risk of operating nuclear power plants
Primary Subject
Source
Mar 1983; 8 p; Health Physics Society Chapter meeting; Richland, WA (USA); 1 May 1983; CONF-830553--1; Available from NTIS, PC A02/MF A01 as DE83012796
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue